Chiayi CityScenic Spots
- Up: Show photo menu
- Down: Hide photo menu
- Left: Last photo
- Right: Next photo
- ESC: Leave album
Probability of precipitation
20%
Air Quality Index (AQI)
27
Good
Construction of the Alishan Forest Railway was commenced in 1899 by the Japanese. Intended to transport logs down the mountain, it has a 762mm gauge, a gradient of 6.25%, and a minimum turning radius of 40 meters. Traffic was opened on the 66.6-kilometer stretch between Chiayi and Erwanping in 1912, and was extended up Alishan to a full length of 71.4 kilometers in 1914. The railway climbs from 30 meters above sea level to 2,216 meters, has 47 tunnels and 72 bridges, and passes through a cross-section of climates and terrain types.
From Chiayi, the railway travels along relatively flat terrain for 14.2 kilometers before beginning the long climb, corkscrewing around Mt Duli, climbing 200 meters over a distance of five kilometers. The railway then travels on to Pingzhena Station. From here it zigzags up the mountain, reversing direction at each new section of line as it gradually ascends Alishan.
Intended to transport logs and carry supplies, the railway has now become an integral part of the Alishan recreation facilities. After the Alishan Express was established in 1984 (requiring 3 hours and 15 minutes for the complete journey), some of the carriages of the original trains were converted into hotel accommodation. A number of locomotives are also on display at the Old Railway Display Area located near Zhaoping Railway Station.
Travel Information
(Traffic information is subject to change. Please check with the
transportation station before departure.)
Transportation:Nat'l Fwy 1 → Exit at the Chiayi Interchange → County Hwy 159 → Beigang Rd. → Sec. 2, Bo'ai Rd. → Houyi St.
Public:Take THSR or TRA to Chiayi Station, transfer Alishan Forest Railway to Alishan.
Bus stops
National Highway Bus
Taiwan Railways
Travel Information
trip
-
Two-day Hiking Tour of Alishan
trip
Area Information
Last update time:
Aug 14, 2024